| Date | Tasks | Total Man Hours |
| 04/30/05 | Deburred several bulkhead ribs. | 5.00 |
| 05/04/05 | Fabricated several bars for the F-705 bulkhead, using a hacksaw, vixen file and grinder. | 2.00 |
| 05/06/05 | Fitted firewall components, fabricated extra parts for firewall | 2.00 |
| 05/15/05 | Match-drilled the 705-B center section bar. | 1.50 |
| 05/15/05 | Match-drilled the F705-J angle bar (used a drill press for this.) | 1.50 |
| 05/17/05 | Drilled bushing holes in the main bulkhead; countersunk and riveted platenuts (18) | 2.50 |
| 05/22/05 | Match-drilled F705-J,K and L together for bulkhead. | 1.50 |
| 05/25/05 | Deburred parts from 5-22-2005 | 1.00 |
| 05/27/05 | Rough fitted control stick assembly | 2.50 |
| 06/03/05 | Polished (deburred and sanded) all edges of the F-705 parts | 1.50 |
| 06/08/05 | Prepped raw aluminum bulkhead parts | 2.00 |
| 06/10/05 | Primed raw aluminum bulkhead parts | 2.00 |
| 06/12/05 | Match-drilled brackets to center section; dimpled th skins and other parts for the top of the F-705 bulkhead. | 4.00 |
| 06/16/05 | Fabricated extra pieces for the F-710, F-711 bulkhead | 2.00 |
| 06/18/05 | Began riveting firewall together. | 1.50 |
| 06/19/05 | Finished firewall. Worked on Bulkheads. | 3.00 |
| 06/22/05 | Kurt Noltensmeyer - guest riveter (7 rivets in bulkhead, 0.5 hours.) | 1.50 |
| 06/25/05 | Fabricated F-707B and F-635 (x2) | 0.00 |
| 06/27/05 | Deburred seat ribs. | 2.00 |
| 06/30/05 | Cleaned/alodined rear fuselage parts | 3.00 |
| 07/01/05 | Primed rear fuselage parts | 2.50 |
| 7/5/05, 7/7/05, 7/8/05 | Finished F-706, F-707, F-708, F-710, F-711, F-712 bulkheads. | 8.00 |
| 07/13/05 | Worked on the F-705 spar: continued riveting on the angle brackets and started working on the seatbelt anchors. | 2.50 |
| 07/16/05 | Worked to fit a reinforcement to the right longeron. | 6.50 |
| 7/17/05-7/31/05 | Worked on preliminary assembly of center fuselage. Fitted, match-drilled, deburred and dimpled ribs. | 15.00 |
| 07/23/05 | Torqued down all seat belt anchors on the bulkhead; misc. tasks. | 4.00 |
| 07/30/05 | Match-drilled stringers to the fuselage skin (left side) and bottom. | 3.00 |
| 08/02/05 | Continued to match-drill the skins and stringers of the right side of the fuselage. | 1.00 |
| 08/07/05 | Assembled the center fuselage | 3.00 |
| 08/07/05 | Match-drilled the right side of the fuselage cone. | 1.00 |
| 08/16/05 | Match-drilled the right side of the fuselage cone, match-drilled the bottom of the fuselage cone | 2.50 |
| 08/26/05 | Deburred right-hand side of the fuselage skin on the inside, stringer too. | 1.00 |
| 09/05/05 | Deburred stringers (for fuselage) on left side, deburred left fuselage cone skin. | 1.50 |
| 9/3/05, 9/4/05, 9/5/05 | Prepped center fuselage parts for final assembly | 6.00 |
| 09/09/05 | Riveted seat ribs to the aft 704 bulkhead. Assembled baggage ribs and 705. 1000th builder hour logged on this day!!! | 2.00 |
| 09/10/05 | Deburred and trimmed the vinyl from the side skins, bottom skins and bulkheads | 3.50 |
| 09/11/05 | Dimpled the aft fuselage bottom skin, dimpled the center fuselage bottom skins. | 2.50 |
| 09/12/05 | Dimpled the right aft fuselage skin. Riveted the F-11 and F-12 bulkheads to the bottom skin. Note: 6.25": end of longeron notch to the end. | 3.00 |
| 09/14/05 | Notched the longerons. | 0.50 |
| 09/16/05 | Started to assemble rear fuselage. Riveted bulkheads to bottom skins. | 2.00 |
| 09/17/05 | Riveted rear cone section on fuselage. Fitted rudder steps. | 3.00 |
| 09/20/05 | Started to rivet the bottom skin of the fuselage cone to the bulkheads. | 2.00 |
| 09/21/05 | Continued riveting the rear fuselage | 1.50 |
| 09/24/05 | Continued riveting the rear fuselage | 2.00 |
| 09/28/05 | Riveted bottom skin of the center section of fuselage; center ribs (6 of them) done. | 3.00 |
| 10/01/05 | Finished riveting on all the center section ribs to the bottom skin (except curved outer ribs.) | 3.00 |
| 10/09/05 | Riveted the aft fuselage and center fuselage; joined both and clecoed on the forward side skins. | 5.00 |
| 10/12/05 | Match-drilled arm rests to the side skins, match-drilled the center fuselage and aft fuselage rivet rows. | 1.00 |
| 10/15/05 | Rolled forward side skins for transition curve. Rough fitted steps on both sides. Began drilling longerons. | 3.00 |
| 10/18/05 | Match-drilled more rivet holes between the bulkheads and skins on the center section (right side done, started left side.) | 1.50 |
| 10/20/05 | Match-drilled the remaining holes from 10-18-05.. Removed the excess length from both longerons. Reviewed plans and directions. | 1.50 |
| 10/23/05 | Drilled longerons, fitted side skins, installed steps. | 5.00 |
| 10/24/05 | Drilled longerons (finished right hand side.) | 1.00 |
| 10/26/2005, 10/27/05 | Fitted firewall to fuselage. | 4.00 |
| 10/28/05 | Finished drilling the left longeron. Finished firewall. Started auxilary longerons. | 4.50 |
| 11/06/05 | Match-drilled the auxillary longerons and skin stiffeners to the skin (F-719, F-713, and F-712.) | 2.00 |
| 11/11/05 | Aligned the floor stiffeners with the skin. | 3.00 |
| 11/12/05 | Match-drilled all forward section floor stiffeners to the bottom skin. | 1.50 |
| 11/16/05 | Cut holes in the bottom skin for gear supports. Started drilling gear supports. | 1.50 |
| 11/17/05 | Match-drilled the end seat rib to the fuselage side skin. Fitted the right landing gear support. | 3.00 |
| 11/18/05, 11/19/05 | Fitted and drilled the landing gear support (finished right.) Drilled cabin and side ribs on the left side. Fitted the interior panels. Drilled holes for grommets and snap bushings. Built rudder-pedal assembly. Finished center support bracket for rudder pedals [?]. Cleaned/rearranged tools. Fitted angle clips for F-719. | 16.00 |
| 11/20/05 | Match-drilled floorboards to the ribs (center section.) | 4.00 |
| 11/21/05 | Drilled rudder pedal [bracket?] and side supports. Finished match-drilling and dimpling the insde baggage area. Got fuselage ready to disassemble. | 7.00 |
| 11/22/05 | Disassembled front fuselage. Deburred and countersunk longerons. Primed side skins, all metal supports and longeron [?] break components. | 6.00 |
| 11/23/05 | Coninued work from 11/23/05 | 8.00 |
| 11/30/05 | Deburred the aft cone skin where it joins with the longerons and center section. | 1.00 |
| 12/03/05 | Dimpled the top edges of the aft code side skins and the bottom half flanges of the F-706. | 1.00 |
| 12/09/05 | Metro Christmas party - several rivets put in the F0728A channel-F728B angle junction by guests. | 0.00 |
| 12/11/05 | Cleaned off vinyl from the side skins. | 2.00 |
| 12/11/05 | Primed longerons. | 1.00 |
| 12/17/05 | Riveted cabin section to the rear fuselage. | 3.00 |
| 12/19/05 | Dimpled the side fuselage skins (C-frame and squeezer.) | 2.00 |
| 12/26/05 | Riveted the two outside rows of the bottom fo the center fuselage. | 1.00 |
| 12/27/05 | Riveted side skins and forward cabin area. | 6.50 |
| 12/28/05 | Continued work from 12/28/05.) | 2.00 |
| 12/29/05 | Riveted odd and ends inside the baggage area. | 4.00 |
| 12/30/05 | Match-drilled landing gear legs with supports. | 1.00 |
| 01/01/06 | Riveted the side skins of the center section (mostly finished.) | 4.00 |
| Total Man-hours: | 234.50 |